UPDATED: Construction of Sidewalk Ramp from lower level of Welcome Center Parking Garage

1/8/2015

UPDATED: Construction is ongoing for the north sidewalk ramps of the Welcome Center parking garage. The ramp from the second level of the garage will be closed until approximately the end of February timeframe. Pedestrians will need to either use the temporary walkway along the parking garage's entrance/exit roads or use the center stairwell to walk to the Welcome Center. Signs will direct pedestrians on these new walking patterns.